Projects

Infineon
Malaysia ΓÇô Performance based fire engineering Infineon are a large manufacturer of wafers for the computer industry and are building a second plant alongside their existing facility near Penang. The levels combined to form a single fire compartme...
Muja Power Station
Muja Power Station Collie Western Australia ΓÇô Fire and Gas detection Verve EnergyΓÇÖs biggest coal-fired power station powers over 300,000 homes and fire protection is paramount. In 2011 FDC were awarded the Fire System Engineering and Design ...
The Hyatt ΓÇô Fortescue Centre
The Hyatt Hotel is one of Perths most prestigious hotels and adjoins the newly named Fortescue Centre. Fire Design and Commissioning have developed a specification for the upgrade of the fire detection and emergency warning and intercommunications sys...
Other Projects
Sample Project List Verve Kwinana Power Station ΓÇô Fire detection audit, hydrant system booster and pressure relief, deluge system design and test, live fire testing of mock generator with water mist protection. Cockburn Power Station ΓÇô Alter...
Telstra PITC
Protection from wild fire ΓÇô design solutions and specifications Perth International Telecommunications Station (PITC) provides satellite communications for Australian, European and Japanese interests. It plays a critical part in both public and p...
HIsmelt Project
Industrial fire detection, conveyor sprinklers and Alternative Solution. FDC provided an Alternative Solution in accordance with the BCA for buildings and structures at the site as well as specifications for the installation of fire detection and conv...
Mindarie Resource Recovery Centre
Mindarie Western Australia ΓÇô Alternative solution, fire hydrants, hose reel and fire detection design, documentation and commissioning. This facility is the first of its kind in Australia and presents the harshest and most challenging environment...
Panasonic Kulim
Malaysia ΓÇô Performance based fire engineering The new Panasonic plant in Malaysia has a single storey of over 57,000m2 or 5.7 hectares. Within the building the combined process elements form a single fire compartment of over 32,000m2. As the buil...